History of the Eagle
Point Railroad

The master drawing of the Eagle Point Railroad is maintained on a dry erase board so that it can easily be updated with construction progress. In the short history thus far, there have been several adaptations to the Master Concept Plan, which changes as the railroad grows. Progress depends on the availability of people wanting to work on specific projects. There may be several projects underway at any given time.
| 2000 | Birth of the Railroad | 40% of first loop completed. |
| 2001 | First Loop and off into the Woods | Eagle Point loop completed. |
| 2002 | Stillhouse Branch Added | First large trestle and Saddleback Junction completed. |
| 2003 | Leathergap Branch Added | Railroad reaches Cumberland. |
| 2004 | Fredonia Branch Added | Seven Track Eagle Point yard added. |
| 2005 | Kimball Trestle Added | 250' trestle with wye added in four months. |
| 2006 | Originally Planned Railroad Completed | Industrial switching areas added. |
| 2007 | Jackson Loop Complete | Start of Tracy City branch. |
| 2008 | A work in progress | |