Jackson Loop with tunnel, trestle and drawbridge.
Welcome Aboard, Enjoy Your Visit

The Eagle Point Railroad (EPRR) is a privately owned hobby railroad and is not open to the general public. Live steam railroaders wishing to visit are welcome and should make contact through the Chattanooga Society of Model Engineers, Inc. website to arrange a visit.


The EPRR is a 7½" gauge railroad with over 14,000 feet of track covering close to 35 acres of heavily wooded hillsides near the edge of the Cumberland Plateau above Dunlap TN. The track plan is updated often and contains much of the history and details about the railroad.




Jan 30, 2010 Ice & Snow Storm Photos

The EPRR operates as a single track, bi-directional, signal controlled, mountain railroad operation on 2% grades with 60' minimum radius curves on the mainline.

Visiting engineers wishing to operate alone will need to complete an Engineers Operating Guidelines Quiz. Live steamers require a current valid boiler inspection and all equipment must have safety chains, wires or drawbars. Spark arrestors required for wood and coal burners.

Card-Order Operations

2006 Dedication

2006 Award Winning Photo at DLS
by Larry Taylor


The Chattanooga Society of Model Engineers, Inc. is a separate organization from the EPRR; however, it has its base of operations located at the EPRR and provides the railroad with much of the manpower to build and maintain the railroad and facilities. Organized group visit requests are made through contacting CSME representatives.




Kimball Trestle reflected in Mill Pond

Arched Truss span over Stillhouse creek at Monteagle
EPRR History
The first actual track lying began June 2000. The 695' loop around the shop was completed one year later with a dedication marking the achievement being held 14 July 2001. Over 14,000' of track were laid during the following seven years along with over 25 bridges and tall trestles, plus a tunnel.

The building of the EPRR is covered in detail in the continuing history section covering individual years in photos. Each year includes a track plan of the progress by the end of that year to give you an idea of the rate of growth.

Note: We Operate on Central Time
Current Local Time Is:


Dunlap, Tennessee, weather forecast
Articles Published on the EPRR
in Live Steam & Outdoor Railroading
Mar-Apr 2004 - Crossing Stillhouse Creek
Mar-Apr 2005 - There And Back, A Railroad Tale
Sep-Oct 2006 - Two More Trestles on the Mountain, Part One
Nov-Dec 2006 - Two More Trestles on the Mountain, Part Two
Nov-Dec 2007 - Six Years, 12,000, Part One
Jan-Feb 2008 - Six Years, 12,000, Part Two
May-Jun 2008 - Tunnel Below Eagle Rock
in Live Steam Railroading
2009 1st Qt. - The Eagle Point Experience: A Grand Railroad in 1:8 Scale
Future Articles in the Works:
Rocks & Rails
Completing Jackson Loop
Conquering the Monteagle Challenge
Working Roundhouse
Mountain Branch Railroading
A Grand Finish

250' long Kimball trestle and junction crossing Millpond

Website Feedback