The Depot Educational Center

Another Chattanooga Society of Model Engineers, Inc. Project

The structure may be under construction in 2008.

A multi-use facility is still in the planning stages with no final approved drawings available presently. The below drawings are concepts under consideration as of April 2008.

Funding for the facility is coming primarily though member contributions. Additional contributions are welcome.

Educational Center Committee Information: Paul Boberg at (423) 802-3497 [leave message]

Concept Drawings Under Consideration


April 2008      
With a special member donation designated to cover the additional expenses of building a structure larger than originally proposed, a 1512sq' facility, 28' by 54' is now under consideration.

Drawn by Hank Roberts

Click image for larger drawing.
Concept Elevation Drawings Under Consideration if Metal Siding is Used
Front Right Rear Left

March 2008  
1200 sq' floor plan under consideration.
Drawn by Hank Roberts
[Origional design by Ginger Morrison]

Click image for larger drawing.


Photos will come when construction begins.