The Depot Educational Center
Another Chattanooga Society of Model Engineers, Inc. Project
The structure may be under construction in 2008.
A multi-use facility is still in the planning stages with no final approved drawings available presently. The below drawings are concepts under consideration as of April 2008.
Funding for the facility is coming primarily though member contributions. Additional contributions are welcome.
Educational Center Committee Information: Paul Boberg at (423) 802-3497 [leave message]
Concept Drawings Under Consideration
| March 2008 | |
| 1200 sq' floor plan under consideration.
Drawn by Hank Roberts [Origional design by Ginger Morrison] |
![]() Click image for larger drawing. |
Photos will come when construction begins.